Main content start

P&Z Staff Report for Layton Auto Service

Search this PDF in the browser, review county metadata, and fall back to the original file at any time.

Planning & Zoningdepartment
P&Z Public Hearingstopic
known pages

P&Z Staff Report for Layton Auto Service

HTML View PDF View Open Original PDF
?
HTML-first viewing

This HTML record preserves the readable text of the county PDF for browser-first access. The original county PDF remains available as the downloadable file of record.

Use this text-first HTML view to read and search the document in the browser. Use the original PDF when you need the official page layout, bid tab formatting, or the county file itself.

TANEY COUNTY PLANNING COMMISSION
P. O. Box 383 • Forsyth, Missouri 65653
Phone: 417546-7225/7226 • Fax: 417 546-6861
website: IVJVw.taneycotmty.org

TANEY COUNTY PLANNING COMMISSION
DIVISION III STAFF REPORT
LA YTON AUTO SERVICE
NOVEMBER 10, 2008
#08-63

Public Hearing for Layton Auto Service located at 282 Wabash Lane in the 8ranson Township, Sec. 21 Twp.
23 Rng. 21.

The applicant, Gail Layton requests approval to convert an existing building into a commercial auto repair
shop.

History: Approved for Concept October 20, 2008.

General Description: The subject property contains 9.8 acres and is located off Bee Creek Road to Wabash
Lane. The adjoining properties to the request consist of commercial, multi-family, and residential.

Review: The proposed site will consist of a 30' x S6' metal building. The applicant would add on or construct
another 30' x SO' building in the future. The property is to be serviced by individual septic and Public Water
Supply District #3.. The project received a -2 score on the policy checklist, with three negative scores being
a -2 for traffic flow exceeding current road capacities, -10 for road being less than a 40' right of way, and-
10 for no fire hydrant system.

Summary: If the Taney County Planning Commission approves this request, the following requirements shall
apply, unless revised by the Planning Commission:

1. Compliance with the provisions of the Taney County Development Guidance Code that include
plans for the following:

a. Sediment and erosion control (AppendiX B Sec. VI Item 2)
b. Stormwater management (Appendix B Item 3)
c. Land grading permit (Appendix B)
d. Delineation of the 100 year floodplain (Taney County Floodplain Management Ordinance
60.3b Sec. A)
e. Utility easements and bUilding line setbacks (Table 12)
f. Foliage screening or fencing for commercial area that adjoins residential tracts (AppendiX
C)
g. Improvements with scale of buildings, streets, onsite parkJng and utilities (Table 6)

2. Compliance letters from the Fire, Sewer and Water Districts, Health Department, and MoDot, if
applicable.

3. No outside storage of eqUipment or solid waste materials.

4. This decision is subject to all existing easements.

5. Division II Permits will be reqUired for all applicable structures in the development (Chapter 3 Sec.
I Item B).

6. The Decision of Record shall be filed with the Taney County Recorder's Office within 120 days or
the approval shall expire (Chapter II Item 6).

P&Z Staff Report for Layton Auto Service

The original county PDF remains the downloadable record artifact and the printable source document.

Rendering PDF preview...