Main content start

P&Z Staff Report for Fairways At Branson Creek

Search this PDF in the browser, review county metadata, and fall back to the original file at any time.

Planning & Zoningdepartment
P&Z Public Hearingstopic
known pages

P&Z Staff Report for Fairways At Branson Creek

HTML View PDF View Open Original PDF
?
HTML-first viewing

This HTML record preserves the readable text of the county PDF for browser-first access. The original county PDF remains available as the downloadable file of record.

Use this text-first HTML view to read and search the document in the browser. Use the original PDF when you need the official page layout, bid tab formatting, or the county file itself.

TANEY COUNTY PLANNING COMMISSION
P. O. Box 383 • Forsyth, Missouri 65653
Phom: 417 546-7225 / 7226 • Fax: 417546-6861
website: IVJVlV.taneyc01J,1J,ty.org

TANEY COUNTY PLANNING COMMISSION
DIVISION III STAFF REPORT
FAIRWA YS AT BRANSON CREEK
AUGUST 11,2008
#08-44

Public Hearing for the Fairways at Branson Creek in the Oliver Township, Sec. 27 & 22 Twp. 22
Rng.21.

The applicant, GEP, Inc. request approval to develop a single family residential subdivision.

History: Approved for Concept July 21, 2008.

General Description: The subject property contains approximately 78.12 acres and is located off
Branson Creek Blvd. The adjoining properties to the request consist of residential, commercial,
and agriculture.

Review: The proposed site will consist of 134 residential lots and an amenity area. The homes
will have at least 2000 sq. ft. of floor space and the cost will range from $300,000 and up.

Summary: If the Taney County Planning Commission approves this request, the following
requirements shall apply unless revised by the Planning Commission:

1. Compliance with the provisions of the Taney County Development Guidance Code that
include plans for the following:

a. Sediment and erosion control (Appendix B Sec. VI Item 2)
b. Stormwater management (AppendiX B Item 3)
c. Land grading permit (AppendiX B)
d. Delineation of the 100 year floodplain (Taney County Floodplain Management
Ordinance 60.3b sec. A)
e. Utility easements and building line setbacks (Table 12)
f. Foliage screening or fencing for commercial area that adjoins residential tracts
(Appendix C)
g. Improvements with scale of buildings, streets, onsite parking and utilities (Table
6)

2. Compliance letters from the Fire, Sewer and Water Districts (Chapter VI-VII).

3. No outside storage of equipment or solid waste materials.

4. Division I Permits will be required for all applicable structures in the development
(Chapter 3 Sec. I Item B).

5. The decision is subject to all existing easements.

6. The Decision of Record shall be filed in the Taney County Recorder's Office within 120
days or the approval shall expire (Chapter II Item 6).

P&Z Staff Report for Fairways At Branson Creek

The original county PDF remains the downloadable record artifact and the printable source document.

Rendering PDF preview...