Main content start

P&Z Staff Report for Embree Replat

Search this PDF in the browser, review county metadata, and fall back to the original file at any time.

Planning & Zoningdepartment
P&Z Public Hearingstopic
known pages

P&Z Staff Report for Embree Replat

HTML View PDF View Open Original PDF
?
HTML-first viewing

This HTML record preserves the readable text of the county PDF for browser-first access. The original county PDF remains available as the downloadable file of record.

Use this text-first HTML view to read and search the document in the browser. Use the original PDF when you need the official page layout, bid tab formatting, or the county file itself.

TANEY COUNTY PLANNING COMMISSION
P. O. Box 383 • Forsyth, Missouri 65653
Pho"e: 417546-7225/7226 • Fax: 417546-6861
website: wlVJV.taneycounty.org

TANEY COUNTY PLANNING COMMISSION
OIVISION III STAFF REPORT
EMBREE REPLA T
AUGUST 11, 2008
#08-45

Public Hearing for Daniel Embree in the Oliver Township, sec. 24 Twp. 22 Rng. 22.
The applicants, Daniel K. and Dana L. Embree request approval to replat property for a single
family residential subdivision.

Historv: Approved for Concept July 21, 2008.

General Description: The subject property contains apprOXimately 3.01 acres and is located at
182 Fairlawn Dr. The adjoining properties to the request consist of residential.

Review: The proposed site will consist of a one-acre lot for the use of a home site, and a 2 acre
site for the existing home.

Summary: If the Taney County Planning Commission approves this request, the folloWing
requirements shall apply unless revised by the Planning Commission:

1. Compliance with the provisions of the Taney County Development Guidance Code that
include plans for the following:

a. Sediment and erosion control (AppendiX B sec.
VI Item 2)
b. Stormwater management (AppendiX B Item 3)
c. Land grading permit (Appendix B)
d. Delineation of the 100 year floodplain (Taney County Floodplain Management
Ordinance 60.3b Sec. A)
e. Utility easements and building line setbacks (Table 12)
f. Foliage screening or fencing for commercial area that adjoins residential tracts
(Appendix C)
g. Improvements with scale of buildings, streets, onsite parking and utilities (Table
6)

2. Compliance letters from the Fire, Sewer and Water Districts (Chapter VI-VII).

3. No outside storage of equipment or solid waste materials.

4. Division I Permits will be required for all applicable structures in the development
(Chapter 3 Sec. I Item B).

5. The decision is subject to all existing easements.

6. The Decision of Record shall be filed in the Taney County Recorder's Office within 120
days or the approval shall expire (Chapter II Item 6).

P&Z Staff Report for Embree Replat

The original county PDF remains the downloadable record artifact and the printable source document.

Rendering PDF preview...