P&Z Staff Report for Verizon Wireless SSL Tower
Search this PDF in the browser, review county metadata, and fall back to the original file at any time.
P&Z Staff Report for Verizon Wireless SSL Tower
?
This HTML record preserves the readable text of the county PDF for browser-first access. The original county PDF remains available as the downloadable file of record.
Use this text-first HTML view to read and search the document in the browser. Use the original PDF when you need the official page layout, bid tab formatting, or the county file itself.
-~-_. ~~-----
TANEY COUNTY PLANNING COMMISSION
P. O. Box 383 • Forsyth, Missouri 65653
Pho"e: 4/7546-7225/7226 • Fax: 417 546-686/
Ivebsite: 111wlV.taneycotmty.org
TANEY COUNTY PLANNING COMMISSION
DIVISION III STAFF REPORT
VERIZON WIRELESS SSL TOWER
APRIL 14, 2008
#08-21
Public Hearing for Verizon Wireless SSL Tower in the Swan Township Sec. 33 Twp. 24 Rng. 20.
The applicant, Buddy Roberts requests approval to allow Verizon Wireless to place a communications tower
on his property.
History: Approved for Concept March 17, 2008.
General Descriotion: The subject property contains approximately 2 acres and is located off Coy Boulevard.
Review: The proposed site will consist of a 250' SSL tower, a 70 x 70 fenced area at the base of the tower
with a 12 x 30 pre-fab shelter to house the equipment.
Summary: If the Taney County Planning Commission approves this request, the following requirements shall
apply, unless revised by the Planning Commission:
1. Compliance with the provisions of the Taney County Development Guidance Code that include
plans for the following:
a. Sediment and erosion control (Appendix B sec.VI Item 2)
b. Stonmwater management (Appendix B Item 3)
c. Land grading permit (Appendix B)
d. Delineation of the 100 year floodplain (Taney County Floodplain Management Ordinance
60,3b sec. A)
e. Utility easements and building line setbacks (Table 12)
f. Foliage screening or fencing for commercial area that adjoins residential tracts (Appendix
C)
g. Improvements with scale of bUildings, streets, onsite parking and utilities (Table 6)
2. Compliance letters from the Fire, Sewer and Water Districts, FCC and FAA (Chapter VI-VII).
3. No outside storage of equipment or solid waste materials.
4. Division II Permits will be required for all applicable structures in the development (Chapter 3 Sec.
litem B)
5. This decision is subject to all existing easements.
6. The Decision of Record shall be filed in the Taney County Recorder's Office within 120 days or the
approval shall expire (Chapter II Item 6).
I
P&Z Staff Report for Verizon Wireless SSL Tower
The original county PDF remains the downloadable record artifact and the printable source document.