Main content start

P&Z Staff Report for Soup Shop

Search this PDF in the browser, review county metadata, and fall back to the original file at any time.

Planning & Zoningdepartment
P&Z Public Hearingstopic
known pages

P&Z Staff Report for Soup Shop

HTML View PDF View Open Original PDF
?
HTML-first viewing

This HTML record preserves the readable text of the county PDF for browser-first access. The original county PDF remains available as the downloadable file of record.

Use this text-first HTML view to read and search the document in the browser. Use the original PDF when you need the official page layout, bid tab formatting, or the county file itself.

TANEY COUNTY PLANNING COMMISSION
P. O. Box 383 • Forsyth, Missouri 65653
Phone: 417546-7225/7226 • Fax: 417 546-6861
website: IlJH1H'.tlllleycOtmty.org

TANEY COUNTY PLANNING COMMISSION
DIVISION III STAFF REPORT
SOUP SHOP
MARCH 10,2008
#08-4

Public Hearing for the Soup Shop in the Swan Township, Sec. 16 Twp. 23 Rng. 20.

The applicant, Stan Kolar requests approval to operate a small restaurant to be open for breakfast, lunch
and dinner.

History: Approved for Concept February 19, 2008.

General Description: The subject property is located at 9383 East St. Hwy. 76. The adjoining properties to
the request consist of residential and commercial.

Review: The proposed site consists of an existing single family dwelling, a large storage facility, and two
other smaller buildings on 1.49 acres. The property is seryiced by Public Water Supply District #2, and an
individual septic system.

Summary: If the Taney County Planning Commission approves this request, the following requirements shall
apply, unless revised by the Planning Commission:

1. Compliance with the provisions of the Taney County Development Guidance Code that include
plans for the follOWing:

a. Sediment and erosion control (Appendix B Sec. VI Item 2)
b. Stormwater management (Appendix B Item 3)
c. Land grading permit (Appendix B)
d. Delineation of the 100 year floodplain (Taney County Floodplain Management Ordinance
60.3b Sec. A)
e. Utility easements and building line set backs (Table 12)
f. Foliage screening or fencing for commercial area that adjoins residential tracts (Appendix
C)
g. Improvements with scale of buildings, streets, onsite parking and utilities (Table 6)

2. Compliance letters from the Fire, Sewer and Water Districts (Chapter VI-VII).

3. No outside storage of equipment or solid waste materials.

4. Division II Permits will be required for all applicable structures in the development (Chapter 3 Sec.
litem B).

5. The Decision of Record shall be filed with the Taney County Recorder's Office within 120 days or
the approval shall expire (Chapter Ii Item 6).

P&Z Staff Report for Soup Shop

The original county PDF remains the downloadable record artifact and the printable source document.

Rendering PDF preview...