P&Z Staff Report for Addition Of Well 6 And Storage Facility Tri-Lakes Utilities
Search this PDF in the browser, review county metadata, and fall back to the original file at any time.
P&Z Staff Report for Addition Of Well 6 And Storage Facility Tri-Lakes Utilities
?
This HTML record preserves the readable text of the county PDF for browser-first access. The original county PDF remains available as the downloadable file of record.
Use this text-first HTML view to read and search the document in the browser. Use the original PDF when you need the official page layout, bid tab formatting, or the county file itself.
TANEY COUNTY PLANNING COMMISSION
P. O. Box 383 • Forsyth, Missouri 65653
Pha"e: 417546-7225/7226 • Fax: 417546-6861
website: WIV1P. tan e)'101tl'lty. org
TANEY COUNTY PLANNING COMMISSION
DIVISION III STAFF REPORT
ADDITION OF WELL #6 AND STORAGE FACILITY
TRI-LAKES UTILITIES
APRIL 14, 200B
#OB-2S
Public Hearing for the addition of well #6 and storage fadlity for Tri-Lakes Utilities located off Skyview Dr. in
the Branson Township Sec. 15 Twp. 22 Rng. 22.
The applicants, Harold and Sharon Epps request approval to place a storage facility and well house for Tri-
Lakes Utilities.
Historv: Approved for Concept March 10, 2008.
General Description: The subject property contains 4 acres more or less and is located on the left side of
Skyview Dr. just passed the Faith Christian Academy. The adjoining properties to the request consist of
residential
Review: The proposed site will consist of a well, well house, pipe addition, security chain link fence, security
camera, storage tank for 500,000 gallons of potable water, three phase power pump operation and chorine
fadlity unit.
Summary: If the Taney County Planning Commission approves this request, the following requirements shall
apply, unless revised by the Planning Commission:
1. Compliance with the provisions of the Taney County Development Guidance Code that include
plans for the following:
a. Sediment and erosion control (Appendix B Sec. VI Item 2)
b. Stormwater management (Appendix B Item 3)
c. Land grading permit (Appendix B)
d. Delineation of the 100 year floodplain (Taney County Floodplain Management Ordinance
60,3b Sec. A)
e. Utility easements and building line setbacks (Table 12)
f. Foliage screening or fendng for commerdal area that adjoins residential tracts (Appendix
C)
g. Improvements with scale of buildings, streets, onsite parking and utilities (Table 6)
2. Compliance letters from the Fire, Sewer and Water Districts (Chapter VI-VII):
3. No outside storage of equipment or solid waste materials.
4. Division II Permits will be required for all applicable structures in the development (Chapter 3 Sec.
1 Item B)
5. This decision is subject to all existing easements.
6. The Dedsion of Record shall be filed in the Taney County Recorder's Office within 120 days or the
approval shall expire (Chapter II Item 6).
I
P&Z Staff Report for Addition Of Well 6 And Storage Facility Tri-Lakes Utilities
The original county PDF remains the downloadable record artifact and the printable source document.