Main content start

P&Z Staff Report for Taneywoode Estates

Search this PDF in the browser, review county metadata, and fall back to the original file at any time.

Planning & Zoningdepartment
P&Z Public Hearingstopic
known pages

P&Z Staff Report for Taneywoode Estates

HTML View PDF View Open Original PDF
?
HTML-first viewing

This HTML record preserves the readable text of the county PDF for browser-first access. The original county PDF remains available as the downloadable file of record.

Use this text-first HTML view to read and search the document in the browser. Use the original PDF when you need the official page layout, bid tab formatting, or the county file itself.

TANEY COUNTY PLANNING COMMISSION
DIVISION III STAFF REPORT
TANEYWOODE ESTATES
JANUARY 8, 2007
#06-80

Public Hearing for Taneywoode Estates located at Reno Springs Road in the Jasper Township,
Sec. 1 Twp. 24 Rng. 22.

The applicant, Allen Jenkins requests approval to divide his property into 6 lots, as per the
enclosed plat for single family residential homes.

History: Approved for Concept December 18, 2006.

General Description: The subject property contains 20.07 acres and is located off Reno Springs
Road. The adjoining properties to the request consist of residential and agricultural.

Review: The proposed site will consist of six lots. Access will be from Reno Springs Road. The
adjoining properties to the request consist of residential and agricultural.

Summary: If the Taney County Planning Commission approves this request, the following
requirements shall apply, unless revised by the Planning Commission:

1. Compliance with the provisions of the Taney County Development Guidance Code that
include plans for the following:

a. Sediment and erosion control (Appendix B Sec. VI Item 2)
b. Stormwater management (Appendix B Item 3)
c. Land grading permit (Appendix B)
d. Delineation of the 100 year floodplain (Taney County Floodplain Management
Ordinance 60.3b Sec. A)
e. Utility easements and building line setbacks (Table 12)
f. Foliage screening or fencing for commercial area that adjoins residential tracts
(Appendix C)
g. Improvements with scale of buildings, streets, onsite parking and utilities (Table
6)

2. Compliance letters from the Fire, Sewer, and Water Districts (Chapter VI-VII).

3. No outside storage of equipment or solid waste materials.

4. Division I Permits will be required for all applicable structures in the development
(Chapter 3 Sec. I Item B)

5. The Decision of Record shall be filed with the Taney County Recorder’s Office within 120
days or the approval shall expire (Chapter II Item 6)

P&Z Staff Report for Taneywoode Estates

The original county PDF remains the downloadable record artifact and the printable source document.

Rendering PDF preview...