Document Viewer
OWTS Permit Application Packet
Search this PDF in the browser, review county metadata, and fall back to the original file at any time.
Accessible Web Companion
OWTS Permit Application Packet
HTML View
PDF View
Open Original PDF
?
HTML-first viewing
This accessible companion captures the major visible sections of the onsite wastewater treatment system construction permit packet. Use the original PDF when you need the exact printable packet, plan sheets, or engineering details.
Use this HTML companion as the primary accessible reading version. Use the original PDF when you need the printable form, signature lines, or exact page layout for submission.
Permit Application Fee Form
- Fee receipts transmittal number
- Date paid
- Name of property owner
- Application number
- Address of construction site
- County of construction site
- Telephone number
- Mailing address if different
- Non-refundable application fee of $90.00
Introduction and Submission Steps
- Contact an OWTS registered contractor
- Submit the construction permit application fee form and payment
- Use the construction permit instruction and checklist form
- Submit the completed application, soil morphology report, drawings, and plans
- Site visit and plan review occur before permit issuance
Property and Site Information
- Property owner name
- Site address (911/ENS)
- Subdivision name
- Lot number
- City
- County
- Zip code
- Parcel ID
- Latitude
- Longitude
- Section
- Township
- Range
- Mailing address
- Directions to site
System and Utility Information
- New construction / replacement / repair / expansion
- Single-family, multi-family, or business service
- Daily sewage flow
- Laundry, garbage disposal, food service, lodging, dishwasher, oversized bath, or other
- Number of bedrooms
- Number of occupants
- Public or private water supply details
- Lot size and slope
- Percolation test or soil morphology information
Proposed System Details
- Lagoon or pond details
- Sewage tank and absorption field details
- Alternative system details
- Setback distances
- Installer registration information
Owner Certification and Site Layout
- Owner or agent signature
- Date
- Site layout diagram requirements
- Slope diagram
Readable PDF
OWTS Permit Application Packet
The original county PDF remains the downloadable record artifact and the printable source document.
Rendering PDF preview...