Main content start

RFQ# 201806-411 Airport Engineering Consultant

Search this PDF in the browser, review county metadata, and fall back to the original file at any time.

Purchasingdepartment
Bid Tabulation Informationtopic
known pages

RFQ# 201806-411 Airport Engineering Consultant

HTML View PDF View Open Original PDF
?
HTML-first viewing

This HTML record preserves the readable text of the county PDF for browser-first access. The original county PDF remains available as the downloadable file of record.

Use this text-first HTML view to read and search the document in the browser. Use the original PDF when you need the official page layout, bid tab formatting, or the county file itself.

TANEY COUNTY RFQ
AWARD TABULATION FORM

BID DATE; Wednesday July11, 2018
BID FOR; Airport Engineering Consultant
BID NUMBER; RFQ# 201806-411
July 11, 2018 at 9:30 AM: Two sealed packages were received from the below listed firms,
regarding the above listed RFQ. These were opened per the instructions as detailed within
the RFQ. Shortly thereafter the Airport manager, Mike Mulnik invited the two responders to
make presentations to the selection committee.
August 1, 2018: Garver and Lochner each presented for 30 minutes and answered
questions for 15 minutes (One at 9:30 AM, the other at 10:30 AM). Using an overall
average, Garver LLC achieved the higher score. The evaluation process used was based
on a similar process being used by the Missouri Department of Transportation (MODOT).
The two companies designated for presentations were rated on a previously weighed scale
by three members of a selection committee. The final scores were as follows:
RESPONSE RECEIVED RESULTS
(Company)
Garver, LLC
Presented to the Airport Board.
2049 E. Joyce Blvd.
Final average score = 171 points.
Fayetteville, AR 72703
H.W Lochner, Inc.
Presented to the Airport Board.
903 E. 104th Street, Suite 800
Final average score = 155 points.
Kansas City, MO 64131
August 13, 2018: Airport manager, Mike Mulnik, on behalf of the Taney County Airport
Board, requested the Taney County Commission to award to Garver LLC for future projects
at the Taney County Airport as MODOT Grants become available within the next five years.
A motion was made to award as such and the Commission passed it unanimously. Any
subsequent Agreements will be issued as needed with this award remaining in place until
August 13, 2023.

Thank you.

Ron Erickson,
Director of Purchasing
Taney County Missouri
August 13, 2018

RFQ# 201806-411 Airport Engineering Consultant

The original county PDF remains the downloadable record artifact and the printable source document.

Rendering PDF preview...