Main content start

RFB# 201403-258 Asphalt & Materials

Search this PDF in the browser, review county metadata, and fall back to the original file at any time.

Purchasingdepartment
Bid Tabulation Informationtopic
known pages

RFB# 201403-258 Asphalt & Materials

HTML View PDF View Open Original PDF
?
HTML-first viewing

This HTML record preserves the readable text of the county PDF for browser-first access. The original county PDF remains available as the downloadable file of record.

Use this text-first HTML view to read and search the document in the browser. Use the original PDF when you need the official page layout, bid tab formatting, or the county file itself.

BID AWARD INFORMATION
BID DATE; Tuesday April 29, 2014

BID FOR; Asphalt & Materials

BID NUMBER; RFB# 201403-258

Tuesday April 29, 2014: After opening eight (8) responses received for the above listed RFB, in the
Commission Conference Room – in public, a decision was made to allow a time for a thorough review of
said information by Road & Bridge Coordinator Randy Haes. Thereafter an agenda request was made,
and approved, to deliver a recommendation for award on Monday May 5, 2014.

Monday May 5, 2014: Subsequent to a thorough review of the detailed pricing offered, within each Bid
Package Response received, Mr. Haes recommended a multiple award process as detailed on the
attachments to the Taney County Commission. A motion to award as such was made and it passed
unanimously.

Given the complex nature of this RFB, and the extensive details as asked for within each response, we
asked the Road & Bridge Office Manager – Kathy Roberts to prepare a Bid Tabulation Spreadsheet
which she did in amazing fashion. Please see it attached here. The Taney County Commission used her
spreadsheet as a vital tool to review all responses and thereby concur with the recommendation. For the
record they offered their appreciation directly to Kathy for her hard work resulting in an exemplary
spreadsheet.

Thank you.

Ron Erickson,
Director of Purchasing
Taney County Missouri
May 5, 2014
County of
State of Missouri
TANEY COUNTY COURTHOUSE
P.O. BOX 1018 FORSYTH, MO 65653
(417) 546-7268 FAX: (417) 546-7710

Randy Haes Kathy Roberts Angie Edwards
Interim Road and Bridge Administrator Office Manager Clerk

Date: March 5, 2014

Re: Taney County Bid #201403-258

To: Taney County Commission

Dear Sirs,
I have reviewed the bids received from eight vendors and recommend that award group 1.0
and 2.0 to Coastal Energy Corp. and secondary to Vance Brothers Inc. They were the only
two bidders on these two groups.
Group 3.0, 4.0, 5.0, and 6.0 I would recommend awarding to TRAC Materials as primary
vendor. Secondary on group 3.0 and 4.0 award to Leo Journagan Construction Co.
Group 5.0 secondary award to Clever Stone Co. and group 6.0 award secondary to
American Rock and Concrete.

Randy Haes

Interim Taney County Road & Bridge Administrator
BID TAB FORM 201403-258 American Rock & Concrete
Asphalt & Materials c/o Melissa Johnson
1150 Buchanan Road
Branson, MO. 65616
417-337-7625
Fax-417-337-7628
melissa_forshee2001@yahoo.com

Delivered response time/delivery: 24 Hours

1.0 ASPHALT MATERIALS,FURNISHED AND DELIVERED TO VARIOUS LOCATIONS
IN TANEY COUNTY:

Item # Delivered Unit UNIT PRICE (BID)
Quantity
(Estimate for
2014/2015)

1.1 MC 30 500 Gallon No Bid

1.2 MC 800 5,000 Gallon No Bid

1.3 MC 3000 200,000 Gallon No Bid

2.0 EMULSIFIED ASPHALT MATERIALS FURNISHED AND DELIVERED TO VARIOUS
LOCATION IN TANEY COUNTY:

Item # Delivered Unit UNIT PRICE (BID)

Quantity
(Estimate for
2014/2015)

2.1 EA-300 10,000 Gallon No Bid

2.2 SS-1 20,000 Gallon No Bid

2.3 CRS-2P 50,000 Gallon No Bid

2.4 CRS-2 50,000 Gallon No Bid
2.5 CQS-1FS (Rapid Set Fogseal) 25,000 Gallon No Bid

3.0 BITMINOUS MIX BIDS, FURNISHED AND LAID IN PLACE AT VARIOUS
LOCATIONS IN TANEY COUNTY, AS PER PREVALING WAGE:

Item # Delivered Unit UNIT PRICE (BID)
Quantity
(Estimate for
2014/2015)

3.1 Black Base, Hot Mix 10,000 Ton No Bid

3.2 Hot Mix Surface Material 15,000 Ton No Bid

4.0 BITMINOUS MIX BIDS, FURNISHED AND LOADED ON COUNTY TRUCKS AT
BIDDERS PLANT:

Item # Delivered Unit UNIT PRICE (BID)

Quantity
(Estimate for
2014/2015)

4.1 Black Base, Hot Mix 1,000 Ton No Bid

4.2 Hot Mix Surface Material 15,000 Ton No Bid

4.3 Cold Mix Patch 2,500 Ton No Bid

5.0
BITMINOUS MIX BIDS, DELIVERED TO ALL COUNTY FACILITIES:

Item # Delivered Unit UNIT PRICE (BID)
Quantity
(Estimate for
2014/2015)

5.1 Cold Mix Patch 3,500 Ton No Bid
6.0 CONCRETE FURNISHED AND DELIVERED TO VARIOUS LOCATIONS IN TANEY
COUNTY:

Item # Delivered Unit UNIT PRICE (BID)
Quantity
(Estimate for
2014/2015)

6.1 Concrete Class B 300 Cubic Yards $92.00

6.2 Standard 6-Bag Mix 300 Cubic Yards $94.00

6.3 Flowable Fill 300 Cubic Yards $74.00

Orange Primary

Blue Seconday
APAC-Central Clever Stone Co., Inc. Coastal Energy Corp.
c/o Douglas Fronick c/o David C. Donelson c/o Chad Odle
P.O. Box 1187 1075 Wise Hill Road P.O. Box 218
Springfield, Missouri 65801 Clever, MO. 65631 Willow Springs, MO.
417-868-6700 417-743-2694 417-469-2777
Fax-417-868-6785 Fax-417-743-2945 Fax-417-469-2294
Douglas.Fronick@apac.com mdonelson@cleverstone.com chad@coastal-fmc.com

Delivered response time/delivery: 24-48 Hours Delivered response time/delivery: 24 Hours

Pump charge $70.00, Demurrage $70 per hr after 2 hours

UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID)

No Bid No Bid $3.45

No Bid No Bid $2.98

No Bid No Bid $2.89

UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID)

No Bid No Bid $2.35

No Bid No Bid $2.15

No Bid No Bid $2.32

No Bid No Bid $1.94
No Bid No Bid $2.18

UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID)

$50.00 **Plus haul rate No Bid No Bid

$57.00 **Plus haul rate No Bid No Bid
Asphalt plant is in Willard Mo
(Approx 50 miles from Branson )

UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID)

No Bid No Bid No Bid

No Bid No Bid No Bid

No Bid $55.00 No Bid

UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID)

No Bid $60.00 No Bid
UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID)

No Bid No Bid No Bid

No Bid No Bid No Bid

No Bid No Bid No Bid
Leo Journagan Construction Co., Inc. Tablerock Asphalt Construction Vance Brothers. Inc.
c/o Dale Popejoy c/o Joel Simmons c/o Robert A. Vance
3003 E. Chestnut Expwy, Suite 1200 P.O. Box 1165 5201 Brighton
Springfield, MO. 65802 Branson, MO. 65615 Kansas City, Missouri 64130
417-869-7222 417-334-2144 816-923-4325
Fax-417-869-7421 Fax-417-334-2157 Fax-816-923-6472
dpopejoy@journagan.com joel@tablerockasphalt.com rvance@vancebrothes.com

Delivered response time/delivery: Laid in place--2
Delivered response time/delivery: 1 Week weeks, cold mix---1 week Delivered response time/delivery: 24 Hours ARO

UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID)

No Bid No Bid $3.55

No Bid No Bid $3.40

No Bid No Bid $3.40

UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID)

No Bid No Bid $2.40

No Bid No Bid $2.35

No Bid No Bid $2.65

No Bid No Bid $2.35
No Bid No Bid $2.45

Be available the middle of June at Hollister
South plant

UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID)

$54.65 **Plus haul rate $61.80 **Plus haul rate No Bid

$56.88 **Plus haul rate $68.80 **Plus haul rate No Bid

UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID)

$53.00 $52.00 No Bid

$53.00 $61.00 No Bid

No Bid $56.00 No Bid

UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID)

$70.81 Per Ton Delivered Buchanan
No Bid $71.52 Per Ton Delivered Mt. Branson No Bid
$76.03 Per Ton Delivered Hilda
UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID)

No Bid $117.20 No Bid

No Bid $118.45 No Bid

No Bid $104.50 No Bid
Young/Kerans Construction
c/o Stacy Young
14475 Lawrence 1220
Marionville, MO. 65705
417-719-8555

youngkeransconstruction@gmail.com

UNIT PRICE (BID)

No Bid

No Bid

No Bid

UNIT PRICE (BID)

No Bid

No Bid

No Bid

No Bid
No Bid

UNIT PRICE (BID)

No Bid

No Bid

UNIT PRICE (BID)

No Bid

No Bid

$52.00

UNIT PRICE (BID)

$63.00
UNIT PRICE (BID)

No Bid

No Bid

No Bid

RFB# 201403-258 Asphalt & Materials

The original county PDF remains the downloadable record artifact and the printable source document.

Rendering PDF preview...