RFB# 201310-244 HVAC Replacement RE-BID (Airport)

Search this PDF in the browser, review county metadata, and fall back to the original file at any time.

Purchasingdepartment
Bid Tabulation Informationtopic
known pages

RFB# 201310-244 HVAC Replacement RE-BID (Airport)

HTML View PDF View Open Original PDF
?
HTML-first viewing

This HTML record preserves the readable text of the county PDF for browser-first access. The original county PDF remains available as the downloadable file of record.

Use this text-first HTML view to read and search the document in the browser. Use the original PDF when you need the official page layout, bid tab formatting, or the county file itself.

BID TABULATION FORM (Review Phase)

BID DATE; Tuesday November 19, 2013

BID FOR; HVAC Replacement RE-BID (Airport)

BID NUMBER; RFB# 201310-244

VENDORS
Harris ED’S Heating & D & B HVAC
ITEM # DESCRIPTION (From Bid Specifications Page - Pricing Bid Table) Mechanical Cooling Systems
11.1 10-ton, 11 EER rating heat pump. $9,440.00 $12,998.00 $7,472.00
11.2 Matching air handler. $6,330.00 Included Above $3,056.00
11.3 36w backup heat. $950.00 Included Above $527.00
11.4 Programmable heat pump thermostat. $190.00 $150.00 $448.00
11.5 Installation of ducting with R8 insulation on the branch runs. $9,870.00 $4,200.00 $8,394.00
11.6 Safety pan with a kill switch under the unit. $500.00 $300.00 $185.00
11.7 The air handler should be installed by suspending it below the existing “Subs: Plumber, $8,987.00
air handler which may require removal and reinstallation of one sprinkler Ceiling,
and removal and reinstallation of the suspended ceiling in the airport Electrician.”
manager’s office.
11.8 The sprinkler and ceiling components of this project may require a Sub- $1000.00 $2,292.00 $2,841.00
Contractor.
11.9 TOTAL $28,280.00 $19,940.00 $31,911.00
12.4 GRAND TOTAL BID PRICE (From Bid Specifications Page) $28,280.00 $19,940.00 $31,911.00

Tuesday November 19, 2013: Three responses were received to the above listed Bid. All were opened in public
reflecting the above information. Harris Mechanical of Taneyville was the first response; Ed’s Heating & Cooling of
Hollister was the second response, and D & B HVAC Systems of Branson the third.

Mark Parent, Airport Manager, will complete a thorough review of all responses after which he will formulate a
recommendation to submit to the 10 person Taney County Airport Board. Once the Airport Board completes their review
and reaches a consensus for an award recommendation – we will make an agenda request to deliver their award
recommendation to the Taney County Commission for their review and vote.

Monday December 2, 2013: Subsequent to a thorough review the Taney County Airport Board – through Airport
Manager Mark Parent, has today recommended for award the low Bidder above = Ed’s Heating & Cooling of Hollister,
Mo. The Taney County Commission voted unanimously to award as recommended.

Thank you.

Ron Erickson,
Director of Purchasing
Taney County Missouri
December 2, 2013

RFB# 201310-244 HVAC Replacement RE-BID (Airport)