Main content start

RFB# 201307-233 Construction Materials (R&B Bldg.)

Search this PDF in the browser, review county metadata, and fall back to the original file at any time.

Purchasingdepartment
Bid Tabulation Informationtopic
known pages

RFB# 201307-233 Construction Materials (R&B Bldg.)

HTML View PDF View Open Original PDF
?
HTML-first viewing

This HTML record preserves the readable text of the county PDF for browser-first access. The original county PDF remains available as the downloadable file of record.

Use this text-first HTML view to read and search the document in the browser. Use the original PDF when you need the official page layout, bid tab formatting, or the county file itself.

BID RESULTS SUMMARY
BID DATE; Tuesday August 27, 2013

BID FOR; Construction Materials (R&B Bldg.)

BID NUMBER; RFB# 201307-233

RESPONSES RECEIVED COST LISTED ON BID RESPONSE (Grand Total)
(Company)
Ava Building Supply LLC
Ava, Missouri $10,673.57
Meeks
Branson, Missouri $11,118.15
Herrman Lumber
Branson, Missouri $10,436.81
TANCO Lumber
Forsyth, Missouri $10,440.35

Tuesday August 27, 2013: After opening responses to the above listed Bid, from the above listed companies, a
decision was made to allow a time for a thorough review of all information packages as received from each by Taney
County Road & Bridge Coordinator Randy Haes. An agenda request was made and approved for an award
recommendation to be made to the Taney County Commission on Thursday August 29, 2013.

Thursday August 29, 2013: Subsequent to a thorough review of all the detailed pricing offered, Randy Haes
recommended, to the Taney County Commission, the Bid as received from: Herrman Lumber of Branson, Mo. - listed
above – to be awarded. Three of the four Bids received were very close with the low Bid only $3.46 lower than the
next. We believe this may be the closest we have ever seen Bids come in. The Taney County Commission was very
impressed by this and made mention of their appreciation for the competitive nature of our Local Vendors, asking us on
the air, to express their sincere appreciation to all of these Vendors for their efforts concerning this response.

Thereafter the Commission made a motion to award, based on the recommendation, and it passed unanimously.

Thank you.

Ron Erickson,
Director of Purchasing
Taney County Missouri
August 30, 2013
Bid Tab Form 201307-233 Ava Bldg Supply LLC. Herrman Lumber Company Meek's Tanco Lumber
Closed 08/27/2013 906 NW 12th Avenue P.O. Box 58 155 Stonetree Lane P.O. Box
Construction Materials (R&B Building) Ava, MO. 65608 Hollister, Mo. 65672 Branson, Mo. 65616 Forsyth, Mo. 65653
(417)683-3901 (417)334-7878 (417)334-3193 (417)546-3008
Fax(417)683-6244 Fax(417)334-7877 Fax(417)334-3216 Fax(417)546-2612
absupply@centurylink.net jsonnenflet@herrmanlumber.com eric.carley@meeklumber.com lumber@tri-lakes.net

1.0 Pricing

Furnish necessary materials as detailed below. Price MUST include delivery to
the construction site across the street from the Taney County Courthouse on
David St. (N.side). We have estimated the following materials for this project
being added here as an aid, or in lieu of an in person inspection. The county
will not be held to any minimums nor maximums.

Item Description EST. Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price

Shed Type Trusses: 36” Height on Ridge, 6” on Tail, 24” on Center.
1.1 (More details will follow.) 25 $69.92 $1,748.00 $81.40 $2,035.00 $72.21 $1,877.36 $72.21 $1,997.50
1.2 2 x 6 x 12 SPF (#2, NO Yellow Pine) 150 $5.93 $889.50 $6.06 $909.00 $6.25 $937.50 $5.85 $877.50
1.3 2 x 6 x 16 SPF (#2, NO Yellow Pine) 60 $8.19 $491.40 $8.04 $482.40 $7.85 $471.00 $7.80 $468.00
1.4 2 x 4 x 12 SPF (#2, NO Yellow Pine) 125 $3.97 $496.25 $3.98 $497.50 $4.03 $503.75 $3.80 $475.00
1.5 2 x 4 x 16 SPF (#2, NO Yellow Pine) 75 $5.44 $408.00 $5.42 $406.50 $5.29 $396.75 $5.55 $416.25
1.6 2 x 12 x 16 SPF (#2, NO Yellow Pine) 5 $21.90 $109.50 $19.29 $96.45 $20.77 $103.85 $17.95 $89.75
1.7 4x8x7/16” chip board 40 $10.99 $439.60 $8.35 $334.00 $9.75 $390.00 $8.60 $344.00
1.8 4x8x5/8” CDX plywood 43 $20.98 $902.14 $22.80 $980.40 $17.04 $732.72 $22.50 $967.50
Approximately 13 square metal roofing 29 gauge, Brown in color, with 13 $59 $767.00 $61 $793 $70.763 $1202.97 $61.5 $799.5
1.9 trim & screws. 1000 Screws .07 $70.00 0.00 $54.95 0.00 $49.00 0.00 0.00
1.10 3000 square feet of ½” sheet rock 3000sq. ft. $0.28 $840.00 $0.25 $752.00 $0.26 $768.00 $0.27 $795.00
1.11 1,300 square feet of 5/8” sheet rock 1300 sq. ft. $0.32 $416.00 $0.27 $354.24 $0.28 $357.50 $0.30 $383.50
1.12 3.0 x 6-8 Entry Doors 6 panel 2 $124.99 $249.98 $131.75 $263.50 $200.65 $401.30 $149.00 $298.00
1.13 3.0 x 6-8 Interior Doors 6 panel 4 $50.95 $203.80 $58.00 $232.00 $69.50 $278.00 $57.60 $228.00
1.14 36” wide by 48” height Windows 5 $100.44 $502.20 $96.01 $480.88 $105.50 $527.50 $99.00 $495.00
1.15 1,500 sq. ft. 6” batt insulation 1500 sq. ft. $0.40 $600.00 $0.38 $587.20 $0.39 $585.00 $0.38 $570.00
1.16 3 ¼” nails for Bostich nail gun (or equivalent) 6-boxes $37.30 $223.80 $26.79 $160.74 $29.85 $179.10 $30.00 $180.00
1.17 2 3/8” nails for Bostich nail gun (or equivalent) 3-boxes $25.90 $77.70 $22.21 $66.63 $27.50 $82.50 $28.00 $84.00
The siding is estimated at 1,050 square feet. Siding needs to be
“HardiePanel” Brand – OR LIKE Brand. 5/16” thick. Prefinished factory-
1.18 primed fiber-cement vertical siding in STUCCO texture. 1.050 sq.ft. $1,238.70 $1,006.17 $988.35 $971.85

Misc. Items $286.00
Grand Total $10,673.57 Grand Total $10,436.81 Grand Total $11,118.15 Grand Total $10,440.35

Recommedation: I recommend that the Construction Materials(R&B Building)l bid be awarded to Herrman Lumber as they are the lowest bidder.

Randy Haes, Interim Road & Bridge Administrator

Prepared by Kathy Roberts

RFB# 201307-233 Construction Materials (R&B Bldg.)

The original county PDF remains the downloadable record artifact and the printable source document.

Rendering PDF preview...