BID TABULATION FORM
BID DATE; Thursday May 2, 2013
BID FOR; Aggregate Road Materials
BID NUMBER; RFB# 201304-220
Thursday May 2, 2013: The Taney County Commission met in reference to the above listed RFB. After opening
responses from ten (10) different Vendors, a request was made to set a time certain for a recommendation after
review. Monday May 13, 2013 was set for said recommendation.
Monday May 13, 2013: Subsequent to a thorough review by Randy Haes with Road & Bridge, of all the detailed pricing
offered, – in great detail – Mr. Haes recommended awarding per the attached letter from him to the Taney County
Commission – in the order, as detailed, per his list. (NOTE: Concerning Groups #4 thru #5.3 the award
recommendations were not to the Low Bidder as listed on paper which was due to factoring in mileage, haul, and pick
up costs.)The Taney County Commission made a motion on each “Group Item Number” separately, and voted on each
passing all unanimously. Please see attached letter as well as full Bid Tab. (Prepared by: Kathy Roberts, Taney County
Road & Bridge Office Manager.)
Thank you.
Ron Erickson,
Director of Purchasing
Taney County Missouri
May 13, 2013
BID TAB FORM 201304-220 APAC-Missouri, Inc. American Rock & Concrete American Rock & Concrete American Rock & Concrete Blevins Asphalt Const. Co. Inc. Clever Stone Co., Inc. Coastal Energy Corp. Concrete Company of the Ozarks Leo Journagan Construction Co., Inc. Leo Journagan Construction Co., Inc. Leo Journagan Construction Co., Inc. Stallcup & Sons Stallcup & Sons Tablerock Asphalt Construction Tablerock Asphalt Construction Tablerock Asphalt Construction Young/Kerans Construction Young/Kerans Construction
Aggregate Road Materials c/o David B.Anderson c/o Mike Swearengin c/o Mike Swearengin c/o Mike Swearengin c/o Teresa G. Stokes c/o Michael J. Donelson c/o Chad Odle c/o John Holiman c/o Dale Popejoy c/o Dale Popejoy c/o Dale Popejoy c/o John Stallcup c/o John Stallcup c/o Jim David c/o Jim David c/o Jim David c/o Stacy Young c/o Stacy Young
4580 W. Calhoun/P.O. Box 1187 1150 Buchanan Road 1150 Buchanan Road 1150 Buchanan Road P.O. Box 230 1075 Wise Hill Road P.O. Box 218 P.O. Box 1565 3003 E. Chestnut Expwy, Suite 1200 3003 E. Chestnut Expwy, Suite 1200 3003 E. Chestnut Expwy, Suite 1200 P.O. Box 783 P.O. Box 783 P.O. Box 1165 P.O. Box 1165 P.O. Box 1165 14475 Lawrence 1220 14475 Lawrence 1220
Springfield, MO. 65802 Branson, MO. 65616 Branson, MO. 65616 Branson, MO. 65616 Mt. Vernon, MO. 65712 Clever, MO. 65631 Willow Springs, MO. Branson, Mo. 65616 Springfield, MO. 65802 Springfield, MO. 65802 Springfield, MO. 65802 Forsyth, MO. 65653 Forsyth, MO. 65653 Branson, MO. 65615 Branson, MO. 65615 Branson, MO. 65615 Marionville, MO. 65705 Marionville, MO. 65705
417-868-6700 417-337-7625 417-337-7625 417-337-7625 417-466-3758 417-743-2694 417-469-2777 417-863-2000 417-869-7222 417-869-7222 417-869-7222 417-546-0866 417-546-0866 417-334-2144 417-334-2144 417-334-2144 417-719-8555 417-719-8555
Fax-417-868-6785 Fax-417-224-1693 Fax-417-224-1693 Fax-417-224-1693 Fax-417-466-7914 Fax-417-743-2945 Fax-417-469-4492 Fax-417-863-2065 Fax-417-869-7421 Fax-417-869-7421 Fax-417-869-7421 Fax-417-334-2157 Fax-417-334-2157 Fax-417-334-2157
david.foreman@apac.com mtsman2002@yahoo.com mtsman2002@yahoo.com mtsman2002@yahoo.com scrabtree@blevinsasphalt.com mdonelson@cleverstone.com chad@coastal-fmc.com jholiman@concocompanies.com dpopejoy@journagan.com dpopejoy@journagan.com dpopejoy@journagan.com jandbstallcup@centrylink.net jandbstallcup@centrylink.net david@tracmaterials.com david@tracmaterials.com david@tracmaterials.com youngkeransconstruction@gmail.com youngkeransconstruction@gmail.com
1.0 AGGREGATE ROCK: DELIVERED BUCHANAN DELIVERED HILDA DELIVERED MT. BRANSON DELIVERED MT. BRANSON DELIVERED HILDA DELIVERED BUCHANAN DELIVERED MT. BRANSON DELIVERED HILDA DELIVERED BUCHANAN
Item Number Quantity Unit UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID)
(Estimate for HOLLISTER NORTH HOLLISTER NORTH HOLLISTER NORTH
2014) DELIVERED PICKED UP DELIVERED PICKED UP DELIVERED PICKED UP DELIVERED PICKED UP DELIVERED PICKED UP DELIVERED PICKED UP DELIVERED PICKED UP DELIVERED PICKED UP DELIVERED PICKED UP DELIVERED PICKED UP DELIVERED PICKED UP DELIVERED PICKED UP DELIVERED PICKED UP DELIVERED PICKED UP DELIVERED PICKED UP DELIVERED PICKED UP DELIVERED PICKED UP DELIVERED PICKED UP
1.1 1/2" Clean Chips 5,000 Ton No Bid No Bid $9.25 $8.25 $13.75 $8.25 $10.00 $8.25 No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid $17.20 $14.00 No Bid $14.00 No Bid $14.00 No Bid No Bid No Bid No Bid 12.85 9.95 17.35 9.95 12.15 9.95 No Bid No Bid No Bid No Bid
1.2 3/8" Clean Chips 25,000 Ton No Bid No Bid $9.00 $7.50 $13.00 $7.50 $9.10 $7.50 No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid $17.20 $14.00 No Bid $14.00 No Bid $14.00 No Bid No Bid No Bid No Bid 12.85 9.95 17.35 9.95 12.15 9.95 No Bid No Bid No Bid No Bid
1.3 3/4" Clean Chips (Concrete Rock) 500 Ton No Bid No Bid $8.25 $7.25 $12.75 $7.25 $9.00 $7.25 No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid $15.20 $12.00 No Bid $12.00 No Bid $12.00 No Bid No Bid No Bid No Bid 12.85 9.95 17.35 9.95 12.15 9.95 No Bid No Bid No Bid No Bid
1.4 1" Base Material 25,000 Ton No Bid No Bid $5.00 $4.00 $9.50 $4.00 $6.10 $4.00 No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid $8.70 $5.50 $7.80 $5.50 No Bid $5.50 No Bid No Bid No Bid No Bid 7.40 4.50 11.90 4.50 6.70 4.50 No Bid No Bid No Bid No Bid
1.5 2" Base Material 1,000 Ton No Bid No Bid $5.30 $4.30 $9.80 $4.30 $6.40 $4.30 No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid $8.70 $5.50 $8.10 $5.50 No Bid $5.50 No Bid No Bid No Bid No Bid 7.65 4.75 12.15 4.75 6.95 4.75 No Bid No Bid No Bid No Bid
1.6 0-6" Sub-Base Material 25,000 Ton No Bid No Bid $5.30 $4.30 $9.80 $4.30 $6.40 $4.30 No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid $8.85 $5.65 $8.35 $5.65 No Bid $5.65 No Bid No Bid No Bid No Bid 7.90 5.00 12.40 5.00 7.20 5.00 No Bid No Bid No Bid No Bid
1.7 2-6" Sub-Base Material 1,000 Ton No Bid No Bid $6.25 $5.25 $10.75 $5.25 $7.25 $5.25 No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid $9.80 $6.60 $8.60 $6.60 No Bid $6.60 No Bid No Bid No Bid No Bid 8.90 6.00 13.40 6.00 8.20 6.00 No Bid No Bid No Bid No Bid
1.8 Pugged Base Rock 2,000 Ton No Bid No Bid $6.00 $5.00 $10.50 $5.00 $7.40 $5.00 No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid 7.90 5.00 12.40 5.00 7.20 5.00 No Bid No Bid No Bid No Bid
$5.90-1/4" Grit $3.00- 1/4" Grit $10.9-1/4" Grit $3.00- 1/4" Grit $5.20-1/4" Grit $3.00- 1/4" Grit
1.9 1/4" Grit (Ice Control Material) 5,000 Ton No Bid No Bid $5.00 $4.00 $9.50 $4.00 $6.10 $4.00 No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid $12.70 $9.50 No Bid $9.50 No Bid $9.50 No Bid No Bid No Bid No Bid $8.90 -1/4" Ice Control $6.00- 1/4" Ice Control $13.4 -1/4" Ice Control $6.00- 1/4" Ice Control $8.20 -1/4" Ice Control $6.00- 1/4" Ice Control No Bid No Bid No Bid No Bid
1.10 Rip Rap 5,000 Ton No Bid No Bid $10.25 $9.25 $14.75 $9.25 $12.50 $9.25 No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid $19.53 $16.00 $18.20 $16.00 No Bid $16.00 No Bid No Bid No Bid No Bid 16.10 13.00 20.60 13.00 15.40 13.00 No Bid No Bid No Bid No Bid
1.11 Shot Rock (up to 12" size rock) 10,000 Ton No Bid No Bid $5.00 $4.00 $9.50 $4.00 $6.50 $4.00 No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid $9.03 $5.50 $7.20 $5.50 No Bid $5.50 No Bid No Bid No Bid No Bid 8.10 5.00 12.60 5.00 7.40 5.00 No Bid No Bid No Bid No Bid
2.0 ASPHALT MATERIALS,FURNISHED AND DELIVERED TO VAIOUS LOCATIONS IN
TANEY COUNTY:
Item Number Quantity Unit UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID)
(Estimate for
2014)
2.1 MC 30 500 Gallon No Bid No Bid No Bid No Bid No Bid No Bid $3.59 No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid
2.2 MC 800 5,000 Gallon No Bid No Bid No Bid No Bid No Bid No Bid $3.10 No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid
2.3 MC 3000 200,000 Gallon No Bid No Bid No Bid No Bid No Bid No Bid $2.86 No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid
3.0 EMULSIFIED ASPHALT MATERIALS FURNISHED AND DELIVERED TO VARIOUS
LOCATION IN TANEY COUNTY:
Item Number Quantity Unit UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID)
(Estimate for
2014)
3.1 EA-300 10,000 Gallon No Bid No Bid No Bid No Bid No Bid No Bid $2.38 No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid
3.2 SS-1 20,000 Gallon No Bid No Bid No Bid No Bid No Bid No Bid $2.08 No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid
3.3 CRS-2P 50,000 Gallon No Bid No Bid No Bid No Bid No Bid No Bid $2.39 No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid
3.4 CRS-2 50,000 Gallon No Bid No Bid No Bid No Bid No Bid No Bid $1.94 No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid
3.5 CQS-1FS (Rapid Set Fogseal) 25,000 Gallon No Bid No Bid No Bid No Bid No Bid No Bid $2.12 No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid No Bid
4.0 BITMINOUS MIX BIDS, FURNISHED AND LAID IN PLACE AT VARIOUS
LOCATIONS IN TANEY COUNTY, AS PER PREVALING WAGE: Reed Springs Reed Springs Reed Springs
Item Number Quantity Unit UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID)
(Estimate for
2014)
4.1 Black Base, Hot Mix 10,000 Ton $55.25 **Plus haul rate No Bid No Bid No Bid $44.05 **Plus haul rate No Bid No Bid No Bid $48.97 **Plus haul rate $48.97 **Plus haul rate $48.97 **Plus haul rate No Bid No Bid $61.80 **Plus haul rate $61.80 **Plus haul rate $61.80 **Plus haul rate No Bid No Bid
4.2 Hot Mix Surface Material 15,000 Ton $57.70 **Plus haul rate No Bid No Bid No Bid $48.25 **Plus haul rate No Bid No Bid No Bid $53.57 **Plus haul rate $53.57 **Plus haul rate $53.57 **Plus haul rate No Bid No Bid $68.80 **Plus haul rate $68.80 **Plus haul rate $68.80 **Plus haul rate No Bid No Bid
5.0 BITMINOUS MIX BIDS, FURNISHED AND LOADED ON COUNTY TRUCKS AT Cold MIX EMULSION Cold MIX MC-250
BIDDERS PLANT:
Item Number Quantity Unit UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID)
(Estimate for
2014)
5.1 Black Base, Hot Mix 1,000 Ton $51.00 No Bid No Bid No Bid $50.00 No Bid No Bid No Bid $54.00 $54.00 $54.00 No Bid No Bid $53.00 $53.00 $53.00 No Bid No Bid
5.2 Hot Mix Surface Material 15,000 Ton $53.00 No Bid No Bid No Bid $52.00 No Bid No Bid No Bid $55.00 $55.00 $55.00 No Bid No Bid $62.00 $62.00 $62.00 No Bid No Bid
5.3 Cold Mix Patch 2,500 Ton No Bid No Bid No Bid No Bid $55.00 $52.00 No Bid No Bid No Bid No Bid No Bid No Bid No Bid $54.00 $54.00 $54.00 $48.25 $53.00
$63.50-3.8" Hot Mix $63.50-3.8" Hot Mix $63.50-3.8" Hot Mix
6.0
BITMINOUS MIX BIDS, DELIVERED TO ALL COUNTY FACILITIES: DELIVERED MT. BRANSON DELIVERED HILDA DELIVERED BUCHANAN
Item Number Quantity Unit UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID)
(Estimate for
2014) $56.90 Buchanan
$58.30 Mt. Branson $49.88 Per Ton Delivered Buchanan $54.63 Per Ton Delivered Buchanan
6.1 Cold Mix Patch 3,500 Ton No Bid No Bid No Bid No Bid $62.77 **Plus haul rate $59.40 Hilda No Bid No Bid No Bid No Bid No Bid No Bid No Bid $57.00 $61.50 $56.30 $54.75 Per Ton Delivered Mt. Branson $59.50 Per Ton Delivered Mt. Branson
$54.75 Per Ton Delivered Hilda $59.50 Per Ton Delivered Hilda
7.0 CONCRETE FURNISHED AND DELIVERED TO VARIOUS LOCATIONS IN TANEY
COUNTY:
Item Number Quantity Unit UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID)
(Estimate for
2014)
7.1 Concrete Class B 300 Cubic Yards No Bid $86.00 $86.00 $86.00 No Bid No Bid No Bid $103.00 No Bid No Bid No Bid No Bid No Bid $102.00 $102.00 $102.00 No Bid No Bid
7.2 Standard 6-Bag Mix 300 Cubic Yards No Bid $87.00 $87.00 $87.00 No Bid No Bid No Bid $97.50 No Bid No Bid No Bid No Bid No Bid $100.00 $100.00 $100.00 No Bid No Bid
7.3 Flowable Fill 300 Cubic Yards No Bid $64.00 $64.00 $64.00 No Bid No Bid No Bid $83.50 No Bid No Bid No Bid No Bid No Bid $90.80 $90.80 $90.80 No Bid No Bid
8.0
FINISHED DIRT LOADED ON COUNTY TRUCKS AT PIT OT QUARRY" COUNTY LOADED STALLCUP LOADED
Item Number Quantity Unit UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID) UNIT PRICE (BID)
(Estimate for
2014)
$5.00 Undercut Dirt $6.00 Undercut Dirt
8.1 Finish Dirt 2,000 Yard No Bid $12.00 Screened $12.00 Screened $12.00 Screened No Bid No Bid No Bid No Bid No Bid No Bid No Bid $7.00 Top Soil with Sod $8.00 Top Soil with Sod No Bid No Bid No Bid No Bid No Bid
$3.50 Un-Screened $3.50 Un-Screened $3.50 Un-Screened $12.00 Screened $13.00 Screened
Red Primary
Blue Secondary
Green Third
RFB# 201304-220 Aggregate Road Materials
The original county PDF remains the downloadable record artifact and the printable source document.