RFP# 201107-143 (CTC) Results
Search this PDF in the browser, review county metadata, and fall back to the original file at any time.
RFP# 201107-143 (CTC) Results
?
This HTML record preserves the readable text of the county PDF for browser-first access. The original county PDF remains available as the downloadable file of record.
Use this text-first HTML view to read and search the document in the browser. Use the original PDF when you need the official page layout, bid tab formatting, or the county file itself.
RFP# 201107-143 (CTC) Results;
On Monday morning September 12, 2011 the Taney County Commission voted to award RFP# 201107-
143 (Computerized Temperature Control) to: EPM - Manufacturers of Computerized Temperature Control
2105 Power Drive Fulton, Missouri 65251. As follows: “Base CTC w/ Volt & Monitoring”. Also listed was
an expected timeframe of 4.3 years with a savings estimate of $96,189.00 per year. This is for the
Justice Center & Jail only.
STIPULATION: If Taney County realizes the estimated savings within the estimated timeframe, please
allow the option to also convert / install like system in the current Courthouse.
Please feel free to contact Mr. Fred Malicoat, assigned project Engineer, who is available to answer any
questions. (Malicoat / Winslow Engineers.) Thank you.
RFP# 201107-143 (CTC) Results
The original county PDF remains the downloadable record artifact and the printable source document.