Main content start

RFP# 201107-143 (CTC) Results

Search this PDF in the browser, review county metadata, and fall back to the original file at any time.

Purchasingdepartment
Bid Tabulation Informationtopic
known pages

RFP# 201107-143 (CTC) Results

HTML View PDF View Open Original PDF
HTML Size 100%
?
HTML-first viewing

This HTML record preserves the readable text of the county PDF for browser-first access. The original PDF remains available as the downloadable record artifact.

Use this HTML version to read and search the document in the browser.

RFP# 201107-143 (CTC) Results;

On Monday morning September 12, 2011 the Taney County Commission voted to award RFP# 201107-
143 (Computerized Temperature Control) to: EPM - Manufacturers of Computerized Temperature Control
2105 Power Drive Fulton, Missouri 65251. As follows: “Base CTC w/ Volt & Monitoring”. Also listed was
an expected timeframe of 4.3 years with a savings estimate of $96,189.00 per year. This is for the
Justice Center & Jail only.

STIPULATION: If Taney County realizes the estimated savings within the estimated timeframe, please
allow the option to also convert / install like system in the current Courthouse.

Please feel free to contact Mr. Fred Malicoat, assigned project Engineer, who is available to answer any
questions. (Malicoat / Winslow Engineers.) Thank you.

RFP# 201107-143 (CTC) Results

The original county PDF remains the downloadable record artifact and the printable source document.

Rendering PDF preview...