Decision of Record for Addition of Well #5 and Storage Facility for Tri-States Utilities
Search this PDF in the browser, review county metadata, and fall back to the original file at any time.
Decision of Record for Addition of Well #5 and Storage Facility for Tri-States Utilities
?
This HTML record preserves the readable text of the county PDF for browser-first access. The original county PDF remains available as the downloadable file of record.
Use this text-first HTML view to read and search the document in the browser. Use the original PDF when you need the official page layout, bid tab formatting, or the county file itself.
11II1II11I1I1I1111111111111111111111111111111111111111I1I1111I11111111
* 2 008 L 2 1 882 3*
800K PAGE
2008L21882
OS/20/2008 10:31 :21AM
REC FEE:30.00
NON-STO FEE:
PAGES: 3
REAL ESTATE DOCUMENT
TANEY COUNTY, MISSOURI
RECORDERS CERTIFICATION
f?~o~
ROBERT A. DIXON
TANEY COUNTY PLANNING COMMISSION
DIVISION III DECISION OF RECORD
APRIL 21, 2008
ADDInON OF WEll #6 AND STORAGE FACILITY
TRI-STA TE UTLITIES
#08-2S
On April 21, 2008 th~ney County Planning Commission (grantor) approved a request by Harold and
Sharon Epps (grantee) to construct a well and storage facility. In accordance with this approval a Division
III Permit #08-25 is issued for the property located at the attached legal description.
The following Decision of Record details this approval and lists all applicable conditions:
Harold and Sharon Epps are authorized to construct a well, well house, pipe addition, security chain link
fence, security camera, 95' x 45' (approximately)storage tank for 500,000 gallons to 1,000,000 gallons of
potable water, three phase power pump operation and chlorine facility unit located off Skyview Dr. With
nine Planning Commissioners present the vote to approve was unanimous. The following conditions shall be
complied with:
1. Compliance with the provisions of the Taney County Development Guidance Code that include
plans for the following:
a. Sediment and erosion control (Appendix B Sec. VI Item 2)
b. Stormwater management (Appendix B Item 3)
c. Land grading permit (Appendix 8 Item 3)
d. Delineation of the 100 year floodplain (Taney County Floodplain Management Ordinance
60.3b Sec. A)
e. Utility easements and building line setbacks (Table 12)
f. Foliage screening around the property with an 8' board fence for commercial area that
adjoins residential tracts (Appendix C)
g. Improvements with scale of bUildings, streets, onsite parking and utilities (Table 6)
2. Compliance letter from the Fire, Sewer and DNR. (Chapter VI-VII).
3. No outside storage of equipment or solid waste materials.
4. Division II Permits will be required for all applicable structures in the development (Chapter 3 Sec.
I Item B).
5. This decision is subject to all existing easements.
6. The Decision of Record shall be filed with the Taney County Recorder's Office within 120 days or
the approval shall expire (Chapter II Item 6).
Legal description attached
Decision of Record for Addition of Well #5 and Storage Facility for Tri-States Utilities
The original county PDF remains the downloadable record artifact and the printable source document.